Paint Mix Room / Paint Kitchen

The paint mix room (paint kitchen) is designed to provide a safe, efficient, and controlled environment for storing, mixing, and dispensing paints and coatings. It must comply with safety regulations, minimize contamination, and support operational efficiency.

General Requirements

    • Location: Must be isolated from areas with open flames, sparks, and high heat sources.
    • Ventilation: Ensure proper air exchange to maintain safe levels of volatile organic compounds (VOCs).
    • Compliance: Adhere to applicable safety and environmental standards 
    Capacity: Accommodate current and projected paint storage and usage volumes.

Structural Specifications

  • Room Dimensions:
    • Minimum size: 2m x 2m, adjustable based on volume requirements.
    • Height: Sufficient to house equipment and allow safe manoeuvring of personnel.
  • Walls and Ceiling:
    • Construct with fire-resistant material.
    • Smooth, non-porous surfaces to prevent paint adherence and facilitate cleaning.
  • Flooring:
    • Chemical-resistant, non-slip, and easily cleanable.
    • Sloped toward a containment drain with sealed connections to prevent leaks.
  • Doors:
    • Self-closing, and fitted with seals to minimize fume escape.
    • Provide an emergency exit if room size and local regulations require.
  •  

Ventilation and HVAC

  • Airflow:
    • Maintain negative pressure to prevent fume escape.
    • Minimum ventilation rate: 6 air changes per hour.
  • Exhaust System:
    • Exhaust fans vented to the exterior.
    • Ductwork designed for handling flammable vapors.
  • Intake Air:
    • Filtered air supply to minimize dust and contaminants.
  • Temperature Control:
    • Maintain an ambient temperature range suitable for paint storage (e.g., 15–25°C). optional
  •  

Electrical System

    • Wiring:
      • Run through conduit with proper grounding.
    • Lighting:
      • Bright, diffused, and shadow-free with LED fixtures preferred.
    • Emergency Systems:
      • Install a backup power supply for exhaust systems.
      • Provide emergency shut-off switches for all electrical equipment.
    •  

Fire and Safety Systems

  • Fire Suppression:
    • Install a sprinkler system rated for flammable liquids.
    • Include portable fire extinguishers (Class B or appropriate for chemicals used).
  • Spill Containment:
    • Containment tray or bund with 110% of the largest container’s volume.
    • Drain to an approved hazardous waste disposal system.
  • Emergency Equipment:
    • Eye wash station and safety shower installed within the room or nearby.
    • Clearly marked exits and emergency signage.
  •  

Storage and Dispensing

  • Racking and Shelving:
    • Chemical-resistant, non-sparking material.
    • Secure shelving to prevent tipping or spills.
  • Paint Containers:
    • Store paints in clearly labeled, approved containers (e.g., DOT-compliant).
  • Dispensing System:
    • Automatic or manual dispensing systems with spill-proof nozzles.
    • Include drip trays and secondary containment for dispensing stations.
  •  

Equipment and Tools

    • Mixing Equipment:
      • Explosion-proof mixers and agitators compatible with stored paints.
    • Personal Protective Equipment (PPE):
      • Dedicated storage area for gloves, masks, and protective suits.
    • Monitoring Devices:
      • Gas detection sensors for VOCs and flammable gases.
      • Temperature and humidity monitors.
    •  

Operational Procedures

  • Access Control:
    • Restrict entry to authorized personnel.
    • Use lockable doors with clear signage for restricted access.
  • Maintenance:
    • Regular inspection and cleaning schedule for all equipment and surfaces.
  • Training:
    • Provide safety training for all personnel using the paint kitchen.
  • Documentation:
    • Maintain records of inspections, inventory, and safety compliance.
  •  

Additional Considerations

  • Integration:
    • Provide connection points for integration with external systems (e.g., production lines or automated dispensers).
  • Future Expansion:
    • Allow space and infrastructure for future capacity increases or equipment upgrades.
  • Waste Management:
    • Include designated storage for hazardous waste, compliant with disposal regulations.
  • This specification outlines the requirements for a compliant and efficient paint mix room. Any deviations should be reviewed to ensure they meet safety and operational standards.